United Arab Emirates · Commercial and industrial

Industrial microgrid with fleet charging

A logistics yard combining rooftop generation, a containerised battery and DC charging for a delivery fleet.

Battery storage containers installed beside a substationIllustrative

Overview

The fleet returns within a two-hour window and requires charging before the next shift, which created a demand spike well above the historical site peak.

High ambient temperatures made thermal management and derating behaviour a selection criterion, not a detail.

System composition

  • 900 kWp of TF-T72 modules on warehouse roofs
  • 1 MWh of TF-C500 storage with liquid cooling and HVAC redundancy
  • Six TF-D120 chargers with dynamic power sharing across twelve connectors
  • Priority charging for contracted vehicles, with depot load held below the site ceiling

Notes from delivery

  • Cabinet derating above 45 °C included in the dispatch logic.
  • Charging schedules aligned to shift changeover times.

Illustrative reference configuration prepared for this website. Not a client reference.

Inquiry

Tell us what the project needs to deliver

Share the load profile, site conditions and target commissioning date. Our engineers reply with a configuration proposal and the documents you need to compare options.