United Arab Emirates · Commercial and industrial
Industrial microgrid with fleet charging
A logistics yard combining rooftop generation, a containerised battery and DC charging for a delivery fleet.
IllustrativeOverview
The fleet returns within a two-hour window and requires charging before the next shift, which created a demand spike well above the historical site peak.
High ambient temperatures made thermal management and derating behaviour a selection criterion, not a detail.
System composition
- 900 kWp of TF-T72 modules on warehouse roofs
- 1 MWh of TF-C500 storage with liquid cooling and HVAC redundancy
- Six TF-D120 chargers with dynamic power sharing across twelve connectors
- Priority charging for contracted vehicles, with depot load held below the site ceiling
Notes from delivery
- Cabinet derating above 45 °C included in the dispatch logic.
- Charging schedules aligned to shift changeover times.
Illustrative reference configuration prepared for this website. Not a client reference.
Inquiry
Tell us what the project needs to deliver
Share the load profile, site conditions and target commissioning date. Our engineers reply with a configuration proposal and the documents you need to compare options.