Netherlands · Commercial and industrial
Greenhouse self-consumption system
Generation across greenhouse roof sections, with storage covering grow-light load outside daylight hours.
IllustrativeOverview
Grow lights run into the evening, while generation peaks at midday, so export limits capped the value of the array without storage.
The roof structure required a light module and a clamp system that avoided additional roof penetrations.
System composition
- 2.4 MWp of TF-M10 modules on specialised greenhouse clamps
- 800 kWh of TF-C100 cabinets near the technical building
- Storage charged from midday surplus and discharged into the lighting circuit after sunset
- Weather station data integrated into the site energy management
Notes from delivery
- Sensor and lighting load data used to size the storage block.
- Roof-mounted equipment inspected with the annual glass check.
Illustrative reference configuration prepared for this website. Not a client reference.
Inquiry
Tell us what the project needs to deliver
Share the load profile, site conditions and target commissioning date. Our engineers reply with a configuration proposal and the documents you need to compare options.