Germany · Commercial and industrial

Industrial rooftop PV with demand control

Rooftop generation on a metal-production hall, with an outdoor storage cabinet clipping the morning demand peak.

Solar modules installed across an industrial rooftopIllustrative

Overview

The site runs two shifts, with compressors and forming lines starting within the same hour and setting a demand peak that the grid contract could not absorb for a planned third line.

Roof area was available on two adjoining halls, but the structural survey limited ballast height and excluded a section with skylights.

System composition

  • 1.2 MWp of TF-M10 modules across two roof planes, string design aligned to the demand window
  • 500 kWh TF-C100 cabinets at the yard edge, feeding the low-voltage bus at the main distribution board
  • Energy management reading production meters every second, holding import below the contracted ceiling
  • Annual module cleaning and cabinet inspection added to the existing maintenance contract

Notes from delivery

  • Demand peak measured after commissioning is reported monthly through the site dashboard.
  • The third production line was added without increasing the grid contract.

Illustrative reference configuration prepared for this website. Not a client reference.

Inquiry

Tell us what the project needs to deliver

Share the load profile, site conditions and target commissioning date. Our engineers reply with a configuration proposal and the documents you need to compare options.